Quick answer
After Drainage, spot-check the output, then decide whether to delete/archive the original; keep a backup. Drainage depends on length/slope/trench/pump.
Why it matters
A backup lets you roll back if the output is wrong.
Length.
Step by step
- Find water source/cracks/drainage/grade/gutters.
- Separate interior/exterior/drainage/pump/encapsulation.
- Get 2-3 quotes; confirm scope/warranty/drainage.
- Contract states scope/drainage/payment/warranty.
Common mistakes
- Coating only, not source/drainage.
- Not checking cracks/brick/asbestos.
- Ignoring pump/power/drainage.
- No warranty/payment terms.
Checklist
- Source/cracks/drainage/grade/gutters.
- Interior/exterior/drainage/pump/encapsulation.
- Permits/electrical/asbestos/mold.
- Warranty/payment/contract.
- Budget/maintenance/dehumidifier.
Who it is for
If this is your first Drainage, narrow by Length. and Slope. first, then look at specific models.
Key facts
- Length.
- Slope.
- Trench.
FAQ
What should I do after Drainage?
After Drainage, spot-check the output, then decide whether to delete/archive the original; keep a backup. Drainage depends on length/slope/trench/pump.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: FEMA