Besides a web tool, Checklist can be handled by built-in OS features, desktop software or the command line. Checklist covers source/drainage/pump/warranty.
Why it matters
Options differ in privacy, batching and quality control.
Source.
Step by step
- Find water source/cracks/drainage/grade/gutters.
- Separate interior/exterior/drainage/pump/encapsulation.
- Get 2-3 quotes; confirm scope/warranty/drainage.
- Contract states scope/drainage/payment/warranty.
Common mistakes
- Coating only, not source/drainage.
- Not checking cracks/brick/asbestos.
- Ignoring pump/power/drainage.
- No warranty/payment terms.
Checklist
- Source/cracks/drainage/grade/gutters.
- Interior/exterior/drainage/pump/encapsulation.
- Permits/electrical/asbestos/mold.
- Warranty/payment/contract.
- Budget/maintenance/dehumidifier.
Who it is for
If this is your first Checklist, narrow by Source. and Drainage. first, then look at specific models.
Key facts
- Source.
- Drainage.
- Pump.
FAQ
What alternatives exist for Checklist?
Besides a web tool, Checklist can be handled by built-in OS features, desktop software or the command line. Checklist covers source/drainage/pump/warranty.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: EPA