Home/Answers/Contract
BASEMENT WATERPROOFING LAB / Contract

Before Contract Processing

Before Contract, back up the original, confirm format/size/quality requirements and close programs that lock the file.

Updated 2026-11-02About 3 minLocal test
Quick answer

Before Contract, back up the original, confirm format/size/quality requirements and close programs that lock the file. Contract states scope/drainage/payment/warranty.

Why it matters

Poor preparation leads to overwrites, failures and rework.

Scope.

Step by step

  1. Find water source/cracks/drainage/grade/gutters.
  2. Separate interior/exterior/drainage/pump/encapsulation.
  3. Get 2-3 quotes; confirm scope/warranty/drainage.
  4. Contract states scope/drainage/payment/warranty.

Common mistakes

  • Coating only, not source/drainage.
  • Not checking cracks/brick/asbestos.
  • Ignoring pump/power/drainage.
  • No warranty/payment terms.

Checklist

  • Source/cracks/drainage/grade/gutters.
  • Interior/exterior/drainage/pump/encapsulation.
  • Permits/electrical/asbestos/mold.
  • Warranty/payment/contract.
  • Budget/maintenance/dehumidifier.

Who it is for

If this is your first Contract, narrow by Scope. and Drainage. first, then look at specific models.

Key facts

  • Scope.
  • Drainage.
  • Warranty.

FAQ

How should I prepare before Contract?

Before Contract, back up the original, confirm format/size/quality requirements and close programs that lock the file. Contract states scope/drainage/payment/warranty.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: FEMA