Quick answer
Quick answer: back up the original, pick the right format/settings, run a small batch, spot-check the output. Grading/soil/gutters direct water away.
Why it matters
Get the shortest path working before optimizing.
Grade.
Step by step
- Find water source/cracks/drainage/grade/gutters.
- Separate interior/exterior/drainage/pump/encapsulation.
- Get 2-3 quotes; confirm scope/warranty/drainage.
- Contract states scope/drainage/payment/warranty.
Common mistakes
- Coating only, not source/drainage.
- Not checking cracks/brick/asbestos.
- Ignoring pump/power/drainage.
- No warranty/payment terms.
Checklist
- Source/cracks/drainage/grade/gutters.
- Interior/exterior/drainage/pump/encapsulation.
- Permits/electrical/asbestos/mold.
- Warranty/payment/contract.
- Budget/maintenance/dehumidifier.
Who it is for
If this is your first Grading, narrow by Grade. and Soil. first, then look at specific models.
Key facts
- Grade.
- Soil.
- Gutters.
FAQ
What is the quick answer for Grading?
Quick answer: back up the original, pick the right format/settings, run a small batch, spot-check the output. Grading/soil/gutters direct water away.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: FEMA