Home/Answers/Grading
BASEMENT WATERPROOFING LAB / Grading

After Grading Processing

After Grading, spot-check the output, then decide whether to delete/archive the original; keep a backup.

Updated 2026-11-02About 3 minLocal test
Quick answer

After Grading, spot-check the output, then decide whether to delete/archive the original; keep a backup. Grading/soil/gutters direct water away.

Why it matters

A backup lets you roll back if the output is wrong.

Grade.

Step by step

  1. Find water source/cracks/drainage/grade/gutters.
  2. Separate interior/exterior/drainage/pump/encapsulation.
  3. Get 2-3 quotes; confirm scope/warranty/drainage.
  4. Contract states scope/drainage/payment/warranty.

Common mistakes

  • Coating only, not source/drainage.
  • Not checking cracks/brick/asbestos.
  • Ignoring pump/power/drainage.
  • No warranty/payment terms.

Checklist

  • Source/cracks/drainage/grade/gutters.
  • Interior/exterior/drainage/pump/encapsulation.
  • Permits/electrical/asbestos/mold.
  • Warranty/payment/contract.
  • Budget/maintenance/dehumidifier.

Who it is for

If this is your first Grading, narrow by Grade. and Soil. first, then look at specific models.

Key facts

  • Grade.
  • Soil.
  • Gutters.

FAQ

What should I do after Grading?

After Grading, spot-check the output, then decide whether to delete/archive the original; keep a backup. Grading/soil/gutters direct water away.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: FEMA